Has the geospatial planning or zoning guidance been carried out according to best practices by: i) being undertaken as part of a strategic environmental and social assessment or equivalent process; and ii) by making the outputs publicly available?
-
Has the country used, carried out or produced geospatial planning or zoning guidance to inform the commercial development of the RE resource?
-
Does the grid code include measures or standards addressing variable renewable energy?
-
Does the country integrate high quality forecasting for any variable RE resources (either through subscription service or provided by national agencies) into their dispatch operations?
-
Are there rules defining the allocation of connection costs and are the connection cost allocation policy considered "deep" (supporting transmission connection for RE generation)?
-
Are generation and transmission planning integrated and include the deployment of renewables?: